I-95/I-395/I-495
interchange construction, looking northeast. |
|
I-95/I-395/I-495
interchange construction, looking north. |
|
I-95/I-395/I-495
interchange construction, looking north.
The Beltway (I-95/I-495 and I-495) runs left-right,
and Shirley Highway (I-95 and I-395) runs bottom to top. The long elevated
bridges are the 2-lane express flyover ramp from the Beltway Inner Loop (from
Wilson Bridge) to I-95 south, and the 2-lane flyover ramp from I-95 north
to the Beltway Outer Loop (to Wilson Bridge) which opened to traffic on January
19, 2006. |
|
I-95/I-395/I-495
interchange construction, looking north. |
|
I-95/I-395/I-495
interchange construction, looking northwest. |
|
I-95/I-395/I-495
interchange construction, looking northwest. The red beams visible in the
left of the photo are at the beginning of the 3-lane ramp under construction
that will connect I-95 northbound to the Beltway Inner Loop (to Tysons Corner),
and the row of bridge piers for this ramp are visible as they curve to the
left. Steel girders will be placed across the tops of the piers and the reinforced
concrete roadway deck will be constructed on top of the girders. |
|
I-95/I-395/I-495
interchange construction, looking west. |
|
I-95/I-395/I-495
interchange construction, looking west along the Beltway toward Tysons Corner.
The long elevated bridge is the 2-lane express flyover ramp from the Beltway
Inner Loop (from Wilson Bridge) to I-95 south. The elevated bridge in the
upper left of the photo, is the 2-lane express flyover ramp from I-95 northbound
to the Beltway Outer Loop (to Wilson Bridge), which opened to traffic on January
19, 2006. |
|
I-95/I-395/I-495
interchange construction, looking west. |
|
I-95/I-395/I-495
interchange construction, looking west. |
|
I-95/I-395/I-495
interchange construction, looking southwest. The long elevated bridge is the
2-lane express flyover ramp from the Beltway Inner Loop (from Wilson Bridge)
to I-95 south. The elevated bridge in the upper left of the photo, is the
2-lane express flyover ramp from I-95 northbound to the Beltway Outer Loop
(to Wilson Bridge) which opened to traffic on January 19, 2006. |
|
I-95/I-395/I-495
interchange construction, looking southwest. |
|
I-95/I-395/I-495
interchange construction, looking southwest. |
|
I-95/VA-644
interchange, (reconstruction completed except for I-95 southbound roadway
which is part of Phase 6 & 7 now under construction), looking north. I-95
runs bottom to top, and VA-644 runs left to right. The Beltway interchange
(I-95/I-395/I-495) is visible in the distance. The 4-lane arterial which runs
up-down along the left edge of the photo, is Backlick Road, and it has a grade
separation over VA-644 Old Keene Mill Road. The new 2-lane I-95 northbound
direct movement to the Beltway Outer Loop (toward Wilson Bridge), begins just
south of the southern most ramp of the VA-644 interchange. |
|
I-95/VA-644
interchange, looking north. |
|
I-95/VA-644
interchange, looking north. I-95 runs bottom to top, and VA-644 runs left
to right. The new 2-lane I-95 northbound direct movement to the Beltway Outer
Loop (toward Wilson Bridge), begins in the lower left of the photo, and it
is the "darker, fresher looking" pavement. |
|
I-95/VA-644
interchange, looking northwest. |
|
I-95/VA-644
interchange, looking northwest. I-95 runs lower-left to upper-right, and VA-644
runs left to right. Loisdale Road is visible in the lower right of the photo,
and that road was expanded in the SIIP, including Commerce Street which is
the continuation of Loisdale Road as it passes under the Old Keene Mill Road
overpass (also built in the SIIP) and then loops over I-95 on the expanded
Commerce Street viaduct. |
|
I-95/I-395/I-495
interchange construction, looking south toward Richmond. The Beltway runs
left-right, and Shirley Highway runs up-down. Shirley Highway (I-95 south
of the Beltway and I-395 north of the Beltway) has 3 mainline lanes each way
and a 2-lane reversible roadway for high occupancy vehicle (HOV) traffic,
and the reversible roadway is between the two general purpose roadways. The
I-95/VA-644 interchange is in the distance. Just right of the center of the
photo, the under-construction new bridges are visible, for the relocated southbound
I-395 roadway and the relocated reversible I-395 roadway, over the Beltway
Inner Loop. |
|
I-95/I-395/I-495
interchange construction, looking south toward Richmond. The curved bridge
near the right lower edge of the photo, is on the recently opened collector-distributor
roadway that carries traffic from southbound I-395 to VA-644 at Springfield. |